Quick Construction Steel Structure Warehouse Environmental Office Building

Quick Construction Steel Structure Warehouse Environmental Office Building

Product Details:

Place of Origin: China Qingdao
Brand Name: XGZ
Certification: CE, ISO, SGS
Model Number: XGZ

Payment & Shipping Terms:

Minimum Order Quantity: 100 square meter
Price: US $30-80 square meter
Packaging Details: Standard Container
Delivery Time: 45 work days
Payment Terms: L/C,T/T
Supply Ability: 5000 Ton Per Month
Get Best Price Contact Now

Detail Information

Package: Steel Pallet And Shipping In Container Aesthetics: Modern
Door: Steel, Rolling, Sliding, Insulation, Fire-Proof Windows: PVC, Alu Windows
Size: As Customer Request Covering Sheet: Ridge Covering Sheet, Trim And Flash
Highlight:

Secure Environmental Steel Structure Warehouse

,

Quick Construction Steel Structure Warehouse

,

Environmental Office Building Steel Structure Warehouse

Product Description

Quick Construction Steel Structure Warehouse Environmental Office Building


Description

Steel structure office building mainly refers to the main load-bearing components of the office building are composed of steel, including steel columns, steel beams, steel structure foundation, steel roof frame, steel roof, pay attention to the steel structure of the wall can also use brick wall maintenance, or brick wall and color steel tile combination.


Advantage

1, steel structure building light quality, high strength, large span.

2, steel structure building construction period is short, reduce the investment cost accordingly.

3. Steel structure building has high fire resistance and strong corrosion resistance.

4, Easy to move, recycling pollution-free.


Characteristic

The construction of steel structure warehouse seems to be an inevitable trend. The steel structure warehouse is assembled from various components. What problems should be paid attention to when building the warehouse to ensure the quality and stability of the warehouse?

(1) It is not recommended to use hollow steel such as square steel, pipe steel, etc., because it is difficult to paint anti-rust paint inside the steel, cold and heat changes in the north, and the rust of the steel condensed water will pollute the ceiling and wall, and seriously endanger safety.

(2) The force of the steel structure layout must be clear, and the force transmission route must be clear and concise. Because the steel structure itself has obvious force and vibration, it is necessary to accurately analyze and calculate, strictly control the structural deformation and vibration frequency, ensure the visual beauty of the structure, eliminate the resonance of the structure and human activities, and avoid the shear fatigue damage of the structure due to resonance. At the same time, it can guarantee the comfort during use.

(3) For the purchase of profiles, generally we have a variety of specifications to choose from. No matter which specification you choose, it is recommended to use "national standard" steel because its steel quality and specifications are better than "non-standard steel". Non-standard steel has high hardness, brittle steel, poor ductility, and is not easy to cut or drill.

(4) Before fixing the channel steel, the side of the channel steel against the wall should be painted with anti-rust paint, but the other parts should be painted after the welding is completed, otherwise it will affect the welding work.

(5) When installing the steel structure, note that the I-beam and channel steel must be of the same specification, and must choose "full welding". The main keel should be whole steel, and intermediate welding is strictly prohibited.


Details

Design Parameter
Life Span 50 years
Safety Classes of Structure Level 2
Seismic Fortification Intensity 7 Degree
Fire Resistance Rating Level 2
Workshop Building Details
Main Steel Structure Part H section Steel Column, Beam and Mezzanine Beam, which are treated oxide primier and grey facing painting
Secondary Steel Structure C section steel as Roof and Wall Purlin, galvanized surface
Support Part Included Tie bar, Roof and Wall Support, Bracing, Sleeve Pipe, Angle Steel
Roof Cladding 0.6mm Steel Sheet+100mm Glasswool Insulation+0.5mm Steel Sheet
Wall Cladding 0.6mm Steel Sheet+100mm Glasswool Insulation+0.5mm Steel Sheet
Mezzanine System Steel Frame+Decking Floor Sheet
Window Aluminium-alloy Window
Brick Wall 1.2m Height


Company

Our corporate purpose is "social development as their own responsibility, improve themselves, create wealth". Platform: and its team. "Development as the core" : "Benefit society" is our corporate mission. Make employees successful. Bring happiness to customers. Thus becoming an enterprise with lasting vitality." With our sound modern management principles. Our company will evolve as comprehensively and quickly as possible, as will our society.

1997

5

FIRST ESTABLISHED IN 1997

5 MAIN PRODUCTION FACTORIES

100+

80+

R&D TEAMS INCLUDING MORE THAN 100 SENIOR ENGINEERS

INTERNATIONAL PARTNERS IN MORE THAN 80 COUNTRIES

2

ONE-STOP SERVICE

2 POULTRY BREEDING BASES



Quick Construction Steel Structure Warehouse Environmental Office Building 0






Want to Know more details about this product
I am interested in Quick Construction Steel Structure Warehouse Environmental Office Building could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.